Dog Training Lead Leash, 10m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Red)

【Leash Size:】10M/32Feet*2CM
【Well made Training Leash:】It’s made of strong nylon with durable metal Buckle, the 29 cm D-ring cushioned handle is firm comfortable hold, works well if you want to tie if off or clip it to your waist, Suitable for trainers.
【Swivel-style Stainless Steel Buckle:】The dog lead comes with a Swivel-style Buckle for easy to attach to your dog’s collar, rotated by 360 degree secure your pet to play in any way safely.

Amazon.co.uk Price: £6.99 (as of 09/09/2020 01:29 PST- Details) & FREE Shipping.

BUY

Category:

【Leash Size:】10M/32Feet*2CM
【Well made Training Leash:】It’s made of strong nylon with durable metal Buckle, the 29 cm D-ring cushioned handle is firm comfortable hold, works well if you want to tie if off or clip it to your waist, Suitable for trainers.
【Swivel-style Stainless Steel Buckle:】The dog lead comes with a Swivel-style Buckle for easy to attach to your dog’s collar, rotated by 360 degree secure your pet to play in any way safely.
【Long Lead:】 The 10meters/32Feet long dog lead is used for train the re-call of your dog, Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming.

Specification: Dog Training Lead Leash, 10m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Red)

Package Dimensions

Colour

Size

10M-32ft

Minimum Width Size

Quantity

batteries required

Batteries Included?

Item Weight

Date First Available

Brand

My Online SuperMarket Store
Logo
Enable registration in settings - general

Do you want to ship the item(s) you’re buying here oversea or you’re not based in the UK but you’ll like your item shipped oversea after your purchase ? Then I have a good news for you! As a cargo company, we will give you 10% Discount off your shipping cost when you buy through this website. Plus you can even buy the item and get it delivered to our warehouse for onward forwarding to your desired destination abroad.